London Luton Airport £2.4 m mid-term car park redevelopment

P1010886.JPG

Project Principals and Objectives

The client needed to enhance the bus route making it more accessible, introduce new stops and increase the number of parking spaces available in the mid-term car park.

In August 2017 Ryebridge was appointed to design and build a circulatory bus route to the MTCP to enable the removal of the current bus spinal lane that acted as the bus drop-off and pick-up route along with passenger vehicle access to create additional parking spaces, segregate pedestrians and interface with pick-up/drop-off buses and passenger vehicles.

Key Quantities Involved

  • 4500m2 asphalt

  • 2500T Type 1

  • 1000m2 MMA Pedestrian Walkway

  • 8No new bus stops – fabricated and installed

  • 16No new drop-off/pick-up islands

  • 450m pedestrian visirail fencing

  • 14No new lamp columns

  • 650m new ducting for supplies

  • 150No new signs and posts

  • 2400m new kerbs